Here's why that belongs on a testing page: "time from a bug being reported to a regression test existing for it" is a concrete, trackable cycle time. And a growing pile of skipped, ignored, or flaky tests is itself a flow-metric signal — work in progress that isn't actually moving — meaning testing debt is piling up faster than it's being paid down, whether or not anyone's tracking it on a board.

Learn more at Atlassian's guide to Kanban, or watch ProKanban's "The Kanban Guide - Kanban Metrics" for a video introduction to the metrics themselves.

Examples you can ask AI

  • What do 'cycle time' and 'throughput' actually mean, in plain terms, for a team's day-to-day work?
  • How would I start tracking cycle time for bug fixes on my own team, without buying new tooling?
  • How do I use flow metrics to make a concrete case that a growing pile of flaky tests is real, measurable technical debt?

Next: Lean Six Sigma for automatic testing →